Brings the mitra app to figma-bestie parity for Home (§1), Undangan
inbox with Curhat Baru + Perpanjang tabs (§2), and the incoming-popup
+ active-chat flow (§3). Home now lives inside a StatefulShellRoute
with BestieTabBar so Profil + Undangan + Home share one shell.
- Shell: features/shell/ (StatefulShellRoute, BestieTabBar, 3 branches)
- Undangan: features/undangan/ — Curhat Baru reads
chatRequestProvider.pendingInvites; row Terima delegates accept to
the notifier and ChatRequestOverlay owns nav (no double-push).
Perpanjang tab stubbed (empty state) until backend exposes
pendingExtensionsProvider.
- Profil: features/profile/ — Bestie-styled stub
- Home: refactored to body-only (shell owns chrome)
- Popup: chat_request_overlay + chat_request_notifier updated to
serve the list rows, not just the modal
- Chat: mitra_chat_screen polish
- Theme: accentAmber tokens for the Perpanjang tab + halo_orb widget
(loading spinner used by undangan list states)
- Login: replace broken GoRouterState location guard with
_expectOtpPush flag — was stacking duplicate /otp pages on OTP
resend (see project-otp-nav-bug-fixed-2026-05-21)
Maestro:
- 17 new flows under .maestro/flows/ts-mitra-{1,2,3}-* covering home
online/offline variants, undangan empty/populated/tolak states,
popup curhat-baru → accept → chat → ended banner, plus popup
dismiss/expire/cancelled edge cases
- 4 new §A OTP flows (07/08/09/10) for invalid/mismatch/expired/cooldown
- Helper scripts: force_mitra_online/offline, force_pairing_timeout,
force_session_expires_at, delete_mitra_status_row,
customer_blast_now (js), customer_cancel_latest_blast
- Backend: POST /internal/_test/delete-mitra-status-row supports the
"fresh mitra with no status row" test setup
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
72 lines
2.2 KiB
YAML
72 lines
2.2 KiB
YAML
# ts-mitra-A-03 — §A.2 happy path → /home
|
|
# Spec ref: requirement/flow_mitra.mermaid.md §A.2 (200 + is_active=true branch).
|
|
#
|
|
# End-to-end S3a → S3b → home for an active mitra:
|
|
# 1. Seed mitra row with is_active=true
|
|
# 2. Reset OTP requests (so cooldown/rate-limit doesn't trip)
|
|
# 3. Drive S3a, request OTP
|
|
# 4. Peek the stub OTP code from the backend
|
|
# 5. Submit it on S3b → /home renders
|
|
appId: com.mybestie.mitra
|
|
env:
|
|
TEST_PHONE: "+628200000301"
|
|
MITRA_DISPLAY_NAME: "Maestro Active"
|
|
BACKEND_INTERNAL_URL: http://localhost:3001
|
|
---
|
|
- runScript:
|
|
file: ../scripts/seed_mitra.js
|
|
env:
|
|
TEST_PHONE: ${TEST_PHONE}
|
|
MITRA_DISPLAY_NAME: ${MITRA_DISPLAY_NAME}
|
|
IS_ACTIVE: "true"
|
|
BACKEND_INTERNAL_URL: ${BACKEND_INTERNAL_URL}
|
|
- runScript:
|
|
file: ../scripts/reset_phone.js
|
|
env:
|
|
TEST_PHONE: ${TEST_PHONE}
|
|
BACKEND_INTERNAL_URL: ${BACKEND_INTERNAL_URL}
|
|
|
|
- launchApp:
|
|
clearState: true
|
|
- extendedWaitUntil:
|
|
visible:
|
|
text: "(?s).*Halo Mitra Bestie.*"
|
|
timeout: 10000
|
|
|
|
# S3a — request OTP.
|
|
- tapOn:
|
|
point: "50%, 53%"
|
|
- inputText: "8200000301"
|
|
- tapOn: "(?s).*kirim kode.*"
|
|
|
|
- extendedWaitUntil:
|
|
visible:
|
|
text: "(?s).*masukin 6 digit kode.*"
|
|
timeout: 10000
|
|
|
|
# Peek the stub OTP that the backend just generated. Stored in output.OTP.
|
|
- runScript:
|
|
file: ../scripts/peek_otp.js
|
|
env:
|
|
TEST_PHONE: ${TEST_PHONE}
|
|
BACKEND_INTERNAL_URL: ${BACKEND_INTERNAL_URL}
|
|
|
|
# Submit it. inputText delivers the chars one-at-a-time via adb shell input;
|
|
# the Focus(canRequestFocus:false)-wrapped TextFields chain focus on each
|
|
# digit and _submit() fires automatically when the 6th digit lands.
|
|
- inputText: ${output.OTP}
|
|
|
|
# Assert: home renders. Stage 2 removed the "Sesi Aktif" / "Riwayat Chat"
|
|
# shortcut tiles — the new BestieHome chrome is greeting + status card +
|
|
# Ganti Status. Asserting "Kamu lagi ONLINE" is the most stable marker
|
|
# that we've made it past auth and the status_notifier loaded.
|
|
- extendedWaitUntil:
|
|
visible:
|
|
text: "(?s).*Kamu lagi (ONLINE|OFFLINE).*"
|
|
timeout: 15000
|
|
- assertVisible:
|
|
text: "(?s).*(Ganti Status|Nyalain Status).*"
|
|
|
|
# Also serves as the Stage 7 design-review visual baseline for the new home.
|
|
- takeScreenshot: ts-mitra-A-03-home-online
|